01
Dehumidifiers
Remove moisture from the air as part of a suitable drying programme. Discuss the affected area and conditions so the equipment requirement can be confirmed.

Kore Environmental / Equipment hire
Dehumidifiers, air movers and drying fans, with equipment hire and managed drying options.
Enquire about hire
Illustrative equipment image. Models supplied may vary.
Hire drying equipment for your property or discuss a managed drying programme. Equipment-only hire and drying assessment, setup and monitoring are quoted as distinct services.
Service scope
For customers who need equipment and will manage its use. Tell us the property location, equipment required and expected hire period. Availability, models, rates and delivery arrangements are confirmed with your quotation.
A separate service for drying assessment, equipment setup and moisture monitoring. For insurance-related projects, discuss the reporting requirements with us at the outset.
Explore water damage restorationHOW WE HELP
One coordinated programme, tailored to the property and agreed scope.
01
Remove moisture from the air as part of a suitable drying programme. Discuss the affected area and conditions so the equipment requirement can be confirmed.
02
Support air circulation across affected surfaces. Equipment selection and positioning depend on the property and the agreed drying approach.
03
For customers managing equipment use themselves. Confirm the requested equipment, property location and expected hire period with your enquiry.
04
A separately quoted service for assessment, equipment setup and moisture monitoring, with reporting requirements agreed at the outset.
YOUR QUESTIONS
Availability, supplied models, hire rates and delivery arrangements are confirmed in your quotation. Contact us with your requirements and expected hire period.
Discuss the size and type of property, affected areas and the cause of the moisture. We can explain the equipment-only and managed drying options before the scope is agreed.
Delivery, collection and setup options are available. The arrangements and costs are confirmed in your quotation.
The building, materials and extent of moisture affect the drying period. A managed drying programme uses moisture monitoring to inform progress; a completion date cannot be confirmed from equipment hire alone.
Discuss a restoration project, asbestos requirements or drying equipment hire with our team.